PROJECTS
RECENT PROJECTS








Project Name: EXTREME OCEAN LUCK DEV’T CORP
Scope of Work: EPC Project (Electrical) for 11 Storey Building
Electrical Plan & Design Analysis
Electronics Design Plan
Installation of Primary Metering System & 2500 kVA Substation
Generator with ATS and LVSG & Building Wiring
Installation of FDAS, CCTV, Data & Telephone

Project Name: KAWAYAN ECO PARK
Scope of Work: 3 Hectares Electrical Works for Construction of Service Entrance, Underground Facilities, Streetlights and Distribution Feeders.

Project Name: WIDUS HOTEL PAMPANGA
Scope of Work: Supply and Installation of Landscape Lighting for Level 1, 4 & 5.

Project Name: : ISOC EDOTCO TOWERS INC (BRGY & TOWN)
Scope of Work: Supply and Installation of Service Entrance and Loadside Installation.

Project Name: PHILIPPINE BILLION REAL ESTATE DEV’T LLC
Scope of Work: 11,000 KVA SUBSTATION, 34.5kV Installation of Primary Metering System (First Private Pole); Installation of 7 units of Pad mounts Type Transformers;

Project Name: International Pipe Industries (Batangas)
Scope of Work: EPC Project; Electrical Plan and Design Analysis Installation of Power Substation and 1-km 13.8kV Primary Lines; Installation of ATS & LVSG (5000AT ACB System) for 5 Factories Installation of Building Wiring for 1st Factory

Project Name: Telford Services Phils., Inc. (ASTI)
Scope of Work: Emergency Power Restoration (Fault by Taal Volcano Ash fall)

Project Name: Telford Services Phils., Inc. (ASTI)
Scope of Work: Conduct Preventive Maintenance on High-voltage Facilities, 4MVA System Conduct Transformer Oil Degasification, Dissolve Gas Analysis & DBV For 2 units of 2MVA Pad mount Transformers

OTHER PROJECTS
2500 KVA SUBSTATION; Installation of 1000kVA and 1500kVA Pad
mount Transformer; Replace LBS and Install Grounding System on First private pole.
3kW Solar Panel System, Roof-top Solution
Includes Processing of Meralco Net-Metering
CCTV & PA System
Installation of 50 Focus Camera and 6 PTZ Wireless Camera
Installation of 28 Speakers of Paging System
installation of 1.5MVA Substation & Meralco Primary Metering,
Installation of 4000AT MDP and Underground Feeder for 600kVA
Motorload
Installation of Electrical Wiring and Heavy Duty LED High Bay Lights
Installation of Service Entrance and Main Distribution Line for Motor
Loads
Installation of Automatic Transfer Switch (1600AT ACB) & Service Entrance
EPC Project,
Electrical Plan and Design Analysis, Installation of Automatic Transfer Switch (3500ACB), Service
Entrance, Industrial wiring, Heavy duty High-bay & Floodlights, cable trays and dry-type
transformers
EPC Project; Design of Electrical Plan & Design Analysis;
Installation of Service Entrance and Building Wiring
EPC Project; Design of Electrical Plan & Design Analysis;
Installation of Service Entrance and Building Wiring & Panel boards, Data &
telephone, CCTV, Streetlights, Installation of Mechanical Piping for Air
Compressor
Upgrading of Main Protection Equipment and
Installation of Feeder line to new building
Upgrading of 3-Phase Service Entrance,
Installation of New MDP & 2 units of CT-Rated Demand Meter
Supply and Installation of 3kW Grid-Tied Solar System